InfoSWMM v11.1 Changes to Date
InfoSWMM v11.1: Support ArcGIS 10.1. InfoSWMM or H2OMAP SWMM import: corrected the typos in error messages. (HsHxfSvr.dll, N/A, 6/22/2012) Improvement: for better hours/minutes listing in Report Manager Report Table for Continuous Simulation with Odd Report Time Step Intervals. For example, this fix improved the output time display for irregular (in 60 minute sense) output time steps. Now it displays 00:50, 01:40, etc. more correctly than before (00:49, 01:39, etc). (HsOutPkg.dll, N/A, 6/21/2012) Improvement or Bug Fix: Added an IF statement to the RDII Unit Hydrograph Convolution for the rare instances in which the user sets the time base of the UH to zero by setting either T or K to zero. The Time Base is T*K in the convolution integral and zero values are not allowed. This bug was also forwarded to the EPA for a future SWMM 5. The convolution uses the value of R and the Time Base to estimate the amount of Infiltration and Inflow in the Sewer Network. The short, medium and lon