Posts

Showing posts with the label Surcharged Time and Flooded Volume Calculated in InfoSWMM and H2OMAP SWMM?

How are Flooded Time, Surcharged Time and Flooded Volume Calculated in InfoSWMM and H2OMAP SWMM?

Image
How are Flooded Time, Surcharged Time and Flooded Volume Calculated in InfoSWMM and H2OMAP SWMM? The  time ,  volume  and  flooded  rate shown in the  InfoSWMM  and  H2OMAP   SWMM  Report File Node Flooding Summary (Figure 2) are  calculated  as follows (Figure 1): For All Nodes NOT Outfalls ( this includes Junctions, Storage Nodes, Dividers) If the New  Volume  is greater than the Full  Volume  of the or there is Overflow then at each  time  step the  Time   Flooded  is increased If the New  Volume  is greater than the Full  Volume  of the or there is Overflow then at each  time  step the  Volume   Flooded  is increased by the Overflow * Time  Step If the New  Volume  is greater than the Full  Volume  of the or there is Overflow AND Surface Ponding is Used then the Ponded  Volume  is New  Volume ...