Posts

Showing posts with the label Pump Priorities in SWMM 5

Pump Priorities in SWMM 5

Image
Subject: Pump Priorities in SWMM 5 The Startup and Shutoff depths are evaluated 1 st followed by any Control Rules. The priority value is just to decide between two or more control rules that are both active at the current time step. The rule with the highest priority will be used or in the case of two rules with the same priority the last control rule evaluated will be used during the current time step.