Low Impact Development Options in H2OMAP SWMM and InfoSWMM

Subject:  Low Impact Development Options in H2OMAP SWMM and InfoSWMM

Low Impact Development Options in H2OMAP SWMM and InfoSWMM

by dickinsonre
Subject:  Low Impact Development Options in H2OMAP SWMM and InfoSWMM

The five options are:

1.       Rain Barrel
2.      Bio Retention Cell
3.      Infiltration Trench
4.      Vegetative Swale
5.      Porous Pavement 
and be entered as controls in the Hydrology Section of the Operations Browser of H2OMAP SWMM or InfoSWMM (Figure 1)

Figure 1.  The Attribute Browser Operation Tab allows you to enter LID Controls for your LID Modeling.




Comments

Popular posts from this blog

Orifice and Weir flow calculations

SWMM 5 Error Messages

EMC Washoff in SWMM5