What Node and Link Invert Elevations Does SWMM 5 Use?
Note: What Node and Link Invert Elevations Does SWMM 5 Use?
· The Node Rim Elevation which is the Node Invert Elevation + the Maximum node depth
· The Ponded Area when the Ponded Area option is used
· The Surcharge Depth above the Node Rim Elevation
· The Link Downstream Offset Depth or Offset Elevation
· The Link Maximum Depth or Diameter
· The Node Highest Pipe Crown Elevation, the new rim elevation will be used in the program
· The Surcharge Depth above the Rim Elevation if the Node has a Surcharge Pressure Depth at the Node during the simulation,
· The Pipe Crown Cannot be above the Rim Elevation of the Node – the program will raise the Rim Elevation when this happens and print a warning in the rpt file.
SWMM 5 uses the following Node information from the user:
· Node Invert Elevation,· The Node Rim Elevation which is the Node Invert Elevation + the Maximum node depth
· The Ponded Area when the Ponded Area option is used
· The Surcharge Depth above the Node Rim Elevation
SWMM 5 uses the following link information from the user:
· The Link Upstream Offset Depth or Offset Elevation and· The Link Downstream Offset Depth or Offset Elevation
· The Link Maximum Depth or Diameter
SWMM 5 calculates the following information internally:
· The Pipe Crown Elevation at the upstream and downstream link nodes. The Pipe Crown is the Pipe Diameter + Link Offsets· The Node Highest Pipe Crown Elevation, the new rim elevation will be used in the program
· The Surcharge Depth above the Rim Elevation if the Node has a Surcharge Pressure Depth at the Node during the simulation,
o If the Surcharge Depth is 0 then the program will either lose the flooded water or store the flooded water during the simulation
· The Flooded Depth above the Rim Elevation if the Node uses the Ponded Area Optiono You have to enter a Ponded Area for the node AND use the Global Allow Ponding Option
SWMM 5 Rules for Pipes
· The Pipe Invert Cannot be below either upstream or downstream node invert – the program will print a warning in the rpt file and set the offset to 0 internally,· The Pipe Crown Cannot be above the Rim Elevation of the Node – the program will raise the Rim Elevation when this happens and print a warning in the rpt file.
The use of Offset Depth or Offset Elevation for the Link Offsets is based on the user choice at the bottom of the SWMM 5 GUI Map.