Two Pass InfoSewer Solution

Two Pass InfoSewer Solution
  • The d/D you are Mapping is from the 1st pass or the solution in which the manhole loads are calculated and the program estimates the flow in the links – the flow gives the value of d/D which you are mapping. 
  • The HGL plot is plotting the adjusted d/D which is the result of the 2nd pass of the solution, this pass estimates backwater, surcharge and pressure and often the value of the Adjusted d/D is higher than the 1st pass value of d/D. 
  • The Adjusted d/D is a better way of finding those pipes that are more than 0.75 full.

Adjusted d/D is a better way of finding those pipes that are more than 0.75 full




Comments

Popular posts from this blog

Types of Stormwater Inlets from HEC12 and HEC22

More St Venant Equations in #SWMM5