How does the Infiltration Maximum Time to Drain the Upper Soil Zone Work in SWMM 5 Green Ampt?
Subject: How does the Infiltration Maximum Time to Drain the Upper Soil Zone Work in SWMM 5 Green Ampt?
Subject: How does the Infiltration Maxi You can use the monthly soil recovery factor (Figure 1) in SWMM 5 to change how the Infiltration Maximum Time The depth of the upper soil zone in the internal SWMM 5 units of feet is calculated at the start of the simulation based on the Green Ampt Soil Saturated Hydraulic Conductivity Upper Soil Zone Depth = 4 * (Soil Saturated Hydraulic Conductivity * 12 * 3600)^0.5 / 12 And the Upper Zone Moisture Depletion Factor and Infiltration Maximum Time Upper Zone Moisture Depletion Factor = Upper Soil Zone Depth / 300 * 12 /3600 * Monthly Evaporation Recovery Factor Infiltration Maximum Time to D Figure 1. Monthly Soil Recovery Factor Figure 2. Infiltration Maximum Time |
Comments
Post a Comment